[RP TownTalk] Trash day remains Monday

varcher at gmail.com varcher at gmail.com
Sun May 31 18:00:25 UTC 2009


Dear all, Apparently there was a mistake in the The Town Crier Calander which says that trash days are Tuesday. There was no change and TRASH DAYS REMAIN MONDAY and THURSDAY. On behalf of town staff I appologize for any and all inconvinience caused by this error.

Best wishes,

Vern
Sent from my BlackBerry® smartphone with SprintSpeed

-----Original Message-----
From: chris Benjamin <theemdnut4139 at yahoo.com>

Date: Sat, 30 May 2009 21:31:36 
To: <towntalk at riverdale-park.org>
Subject: [RP TownTalk] csx railroad crossing



greetings, in regards to the recent track repair, i would like to direct your attetion to the gate malfunction at queensbury road, when i was doing my displays at the mark i saw csx signalman at the signal box on lafyette road working in there, but then a marc train and freight passed the gates and they didnt activate, what has happened was there are a network of wires that ground the signal to the gates from the silver shed next to dumm's corner, when the gates is activated, the computers inside tell the main computer that their is a short circuit (that what makes the gates activate) in the system which then drops the gates, many people believe the engineers have control NO!!!!! the new gates are linked by a new digital system. if you remember the old gates, they used to drop when there was heavy weather such as rain and snow, but, this new system works off of sensors and wires to activate and relay info in the rails itself notifying train location and
 other info, i was there with the track team, as they worked in the station all the way to new york ave, it is suspected that the BALLAST regulator ( a vehicle that spreads the rocks on the track surface evenly) caused the malfunction and the fact that 70 M.O.W. (maintence of way) cars  and 5 trains were working there all day, was the issue. csx track speed thruogh riverdale is 50 mph freight  55 passenger including amtrak (brunswick line) and that shall be left to CSX for further note on changes to track speed. if the gates malfuction, trains must stop before, and blow four long toots and lay flares out to warn drivers of trains and gates. that goes for ALL train systems, FRA rules do apply, the reason why the gates didnt work is because the track team was still workin and the signalman has to RESET the signal in the computer to be interpretated into the rail itself, that takes 2 hours, because they were dealing with marc trains and a two and a half
 mile long heavy freight and the track team all moving at the same times this occured. i hope this answer helps out the resolution to the issue. chris benjamin 


      

_______________________________________________
TownTalk mailing list
To post to the list, send mail to TownTalk at riverdale-park.org
TownTalk-request at riverdale-park.org is for automated subscription processing only
http://riverdale-park.org/mailman/listinfo/towntalk

For more information about Riverdale Park, visit http://www.riverdaleparkmd.info


More information about the TownTalk mailing list