<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=US-ASCII">
<META content="MSHTML 6.00.6000.16809" name=GENERATOR></HEAD>
<BODY id=role_body style="FONT-SIZE: 10pt; COLOR: #000000; FONT-FAMILY: Arial" 
bottomMargin=7 leftMargin=7 topMargin=7 rightMargin=7><FONT id=role_document 
face=Arial color=#000000 size=2>
<DIV>I just want to say thank you Chris.&nbsp; And... also...I want everyone in 
town to know&nbsp;how much I admire you.&nbsp; This is a young man who should be 
honored with resident/citizen of the year!&nbsp; Chris is a strong volunteer in 
the community.&nbsp; As&nbsp; you can see he is a good communicator, intelligent 
and a caring member of society.&nbsp; I can't say enough nice things about 
him.&nbsp; Chris you are a role model for all the young people in town.&nbsp; 
Wish we could clone you!&nbsp; Love you, Audrey Bragg</DIV>
<DIV>&nbsp;</DIV>
<DIV>
<DIV>In a message dated 5/31/2009 9:24:38 A.M. Eastern Daylight Time, 
theemdnut4139@yahoo.com writes:</DIV>
<BLOCKQUOTE 
style="PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: blue 2px solid"><FONT 
  style="BACKGROUND-COLOR: transparent" face=Arial color=#000000 
  size=2><BR>greetings, in regards to the recent track repair, i would like to 
  direct your attetion to the gate malfunction at queensbury road, when i was 
  doing my displays at the mark i saw csx signalman at the signal box on 
  lafyette road working in there, but then a marc train and freight passed the 
  gates and they didnt activate, what has happened was there are a network of 
  wires that ground the signal to the gates from the silver shed next to dumm's 
  corner, when the gates is activated, the computers inside tell the main 
  computer that their is a short circuit (that what makes the gates activate) in 
  the system which then drops the gates, many people believe the engineers have 
  control NO!!!!! the new gates are linked by a new digital system. if you 
  remember the old gates, they used to drop when there was heavy weather such as 
  rain and snow, but, this new system works off of sensors and wires to activate 
  and relay info in the rails itself notifying train location and<BR>other info, 
  i was there with the track team, as they worked in the station all the way to 
  new york ave, it is suspected that the BALLAST regulator ( a vehicle that 
  spreads the rocks on the track surface evenly) caused the malfunction and the 
  fact that 70 M.O.W. (maintence of way) cars&nbsp; and 5 trains were working 
  there all day, was the issue. csx track speed thruogh riverdale is 50 mph 
  freight&nbsp; 55 passenger including amtrak (brunswick line) and that shall be 
  left to CSX for further note on changes to track speed. if the gates 
  malfuction, trains must stop before, and blow four long toots and lay flares 
  out to warn drivers of trains and gates. that goes for ALL train systems, FRA 
  rules do apply, the reason why the gates didnt work is because the track team 
  was still workin and the signalman has to RESET the signal in the computer to 
  be interpretated into the rail itself, that takes 2 hours, because they were 
  dealing with marc trains and a two and a half<BR>mile long heavy freight and 
  the track team all moving at the same times this occured. i hope this answer 
  helps out the resolution to the issue. chris benjamin <BR><BR><BR>&nbsp; 
  &nbsp; &nbsp; 
  <BR><BR>_______________________________________________<BR>TownTalk mailing 
  list<BR>To post to the list, send mail to 
  TownTalk@riverdale-park.org<BR>TownTalk-request@riverdale-park.org is for 
  automated subscription processing 
  only<BR>http://riverdale-park.org/mailman/listinfo/towntalk<BR><BR>For more 
  information about Riverdale Park, visit 
  http://www.riverdaleparkmd.info<BR></FONT></BLOCKQUOTE></DIV></FONT></BODY></HTML>