<div dir="ltr">Greetings, everyone.<div><br></div><div>The construction update quoted here was circulated by the developer to the Towns of Riverdale Park and University Park. For those who may not be aware, Maryland Avenue is the street formerly known as Rhode Island Avenue, which runs next to the MARC stop and then under the Route 410 bridge.</div>
<div><br></div><p class="MsoNormal">"Calvin Cafritz Enterprises</p><p class="MsoNormal"><br></p>

<p class="MsoNormal">"Construction Update Notice: Weeks of March 24 and March 31,
2014<b></b></p><p class="MsoNormal"><br></p>

<p class="MsoNormal">"What to Expect On-Site the Next Two Weeks:</p><p class="MsoNormal"><br></p>

<p class="MsoNormal">"During the next two weeks of construction, the contractor,
L.F. Jennings, will continue installing erosion and sediment control fencing
and ponds, installing perimeter fencing, begin site clearing on the west end of
the site and begin removal and haul-off of excess soil.</p><p class="MsoNormal"><br></p>

<p class="MsoNormal">"These activities will require heavy equipment accessing the
site. Two construction entrances are located along Route 1 located near both
ends of the project site and one entrance at Maryland Avenue.</p><p class="MsoNormal"><br></p>

<p class="MsoNormal">"Lane Closures:</p><p class="MsoNormal"><br></p>

<p class="MsoNormal">"There are no anticipated lane closures associated with this
work.</p>

<p class="MsoNormal"><br></p><p class="MsoNormal">"Construction Hours:</p>

<p class="MsoNormal"></p><div><br></div><div>"Construction Activity will be taking place Monday – Saturday
between the hours of 7 a.m. and 5 p.m."</div><div><br></div><div>Kate Kelly</div></div>